I
Career & Pay
GS Scale · Locality · Promotions · TSP
›
II
Benefits
FEHB · FEGLI · FERS · Leave · Buyback
›
III
Workplace
Telework · RIFs · PIPs · Clearances
›
IV
Professional Development
Training · Certs · SES CDP · EMBA
›
V
Tools & Calculators
Pay · TSP · Leave · Buyback
›
Home › Career & Pay › Time-in-Grade Elimination
Career & Pay · Topic 61 · Career Advancement

Time-in-grade ends in January. Your agency can keep it.

The governmentwide 52-week bar disappears on the 19th. Nothing makes your agency drop its own.

Jan 19
Effective date in the published rule — not the 14th
52 weeks
The governmentwide waiting period being removed
Subpart F
5 CFR part 300 — removed and reserved in full
None
Agencies required to change their merit promotion plans

On October 19, 2026, OPM published a final rule titled Elimination of Time-in-Grade at 91 FR 65887. It removes 5 CFR part 300, subpart F — the governmentwide rule that for decades barred advancement to most competitive-service General Schedule positions at GS-6 and above unless the employee had served 52 weeks in a position no more than one grade lower.

The headline writes itself, and most of the coverage has written it: the calendar no longer gates promotions. OPM Director Scott Kupor put it that way himself — "The old rule made the calendar a gatekeeper." But the rule is narrower than the headline, and in two specific ways it is narrower than almost all of the coverage suggests. This guide is about those two ways.

Section I What the rule actually removes

Subpart F of 5 CFR part 300 is removed and reserved in its entirety. That takes out §§ 300.601 through 300.606 — the definitions, the restriction itself, the exceptions, and the training-agreement and waiver provisions that hung off it. A cross-reference at 5 CFR 410.307(a)(3) goes with it, and conforming amendments touch parts 315, 316, 352 and 410.

The restriction being deleted worked like this. To advance to a covered competitive-service GS position at GS-6 or above, you needed 52 weeks of service in a position no more than one grade lower than the target. In two-grade-interval lines — the professional and administrative series where grades run 5, 7, 9, 11 — the reach was two grades for targets at GS-6 through GS-11. Above GS-11 the one-grade ceiling applied.

What that produced in practice was a waiting period measured in weeks rather than in demonstrated capability, enforced identically across every agency, with a waiver process narrow enough that most HR offices treated it as unavailable. The rule was issued in an era when agencies had far less latitude to set their own promotion criteria, and OPM's view in the preamble is that the latitude now exists and the governmentwide floor has become a ceiling.

The Shape of the Change

Subpart F was a prohibition. Nothing replaces it. What takes its place is silence at the governmentwide level and whatever your agency chooses to write in its own merit promotion plan — which may be nothing, or may be the same 52 weeks under a different citation.

Section II The date most coverage has wrong

The rule is effective January 19, 2027. The DATES section of the published document says so in one sentence — "This rule is effective January 19, 2027." — and the Federal Register's own metadata field for the document carries the same date.

OPM's press release announcing the rule says January 14, 2027. It is wrong, and because press releases circulate faster than Federal Register documents, a great deal of secondary coverage has copied it. You will see both dates. Some agency HR shops are working to the earlier one.

Five days rarely matters. It matters here if an action is being timed to the first pay period on or after the effective date, because the two dates fall in different pay periods for most agencies, and it matters if someone tells you a promotion could not be processed because the rule was not yet in force. Where a press release and a published rule disagree, the published rule controls.

How to settle it in your own office

Pull the Federal Register document — 91 FR 65887, document number 2026-21319, RIN 3206-AP05, docket OPM-2026-0067. The DATES heading sits near the top of the document, directly under the SUMMARY. It is one sentence and it is unambiguous.

Authoritative date: January 19, 2027. The press-release date of January 14 has no legal effect.

Section III What still stands between you and a promotion

Time-in-grade was never the only eligibility requirement, and for most people it was not the binding one. Everything in the table below survives the rule untouched.

Requirement Authority Effect after January 19
OPM qualification standards5 U.S.C. chapter 33Unchanged — usually the real constraint
Specialized experienceThe series qualification standardUnchanged — normally 52 weeks at one grade below
Merit promotion procedures5 CFR part 335Unchanged — agency plan still governs
Job-related agency requirements5 CFR 335.103Unchanged — and may now include service in grade
Classification requirementsAgency classification policyUnchanged
Merit system principles and PPPs5 U.S.C. 2301, 2302Unchanged

The specialized-experience line is the one to sit with. OPM qualification standards for professional and administrative work almost always require one year of specialized experience at or equivalent to the next lower grade of the position being filled. That requirement is measured in time, it looks very much like a 52-week waiting period, and it is not going anywhere. A GS-12 who wants a GS-14 has to show GS-13-level specialized experience, and the removal of subpart F does not supply it.

For the full qualification and competition mechanics, see Competitive vs. Non-Competitive Promotions.

Section IV Your agency can keep a waiting period

This is the part that will surprise people in January. OPM says in the final rule that agencies may establish their own service-in-grade periods. The conditions are that the requirement be job-related, established in advance, set out in writing, and applied consistently — the same conditions that attach to any other promotion prerequisite an agency sets. The natural home for it is the agency merit promotion plan, documented under 5 CFR 335.103.

OPM goes further than merely permitting it. The rule advises agencies that have been relying on the removed § 300.606 to confirm, before the effective date, that any service requirements they intend to keep are documented in their own merit promotion plans. And it is explicit that until an agency revises its plan, the existing plan continues to govern — minus the removed restriction.

That sentence is the practical core of the whole rule. Read it closely and the January 19 picture resolves into three cases.

Case one — the plan relies on subpart F

The waiting period disappears on January 19

If your agency's plan states a time-in-grade requirement only by citing 5 CFR part 300 subpart F, the citation points at a reserved subpart and there is nothing left to enforce. This is the case the headlines describe.

Case two — the plan states its own period

Nothing changes for you at all

If the plan independently requires, say, 52 weeks in grade as an agency prerequisite, that requirement stands on its own feet under 5 CFR 335.103 and keeps operating on January 19 exactly as it did on January 18. Many plans are written this way.

Case three — the agency rewrites the plan

Watch for a new period appearing before the effective date

OPM has effectively invited agencies to write down any service requirement they want to keep. An agency that previously leaned on subpart F may add its own period in the weeks before January 19. That is permitted, and it is the outcome to watch for.

In every case

Career-ladder intervals can survive too

OPM states that agencies may keep career-ladder progression intervals where they are job-related and consistently applied. If your position description shows a GS-9/11/12 ladder with a one-year interval at each step, do not assume the interval vanishes.

The Document That Decides

Your merit promotion plan, not the Federal Register, determines what January 19 means for you. Request the current version from HR now, and read how it states the service requirement. A plan that cites subpart F and a plan that states its own 52 weeks look nearly identical on the page and produce opposite outcomes.

Section V Training agreements and the two-promotion limit

Subpart F carried a cluster of provisions about training agreements, and they go with it. OPM is specific about the transition.

If you are on a formal training agreement, the practical change is that the structure is now entirely your agency's to set, waive or rewrite. That cuts both ways: no OPM-level floor protects the progression schedule you were promised either.

Section VI What does not change

Three areas get asked about constantly whenever a promotion rule moves, and the final rule addresses all three directly. None of them changes.

Promotion pay-setting is also untouched. The two-step rule under 5 CFR 531.214 computes your new rate exactly as before, and you can model it with the Promotion Pay Calculator.

Section VII What to do before January

Before the effective date

Four things worth doing in the next ten weeks

  • Get your merit promotion plan in writing. Ask HR for the current version and find the sentence that states the service-in-grade requirement. Note whether it cites 5 CFR part 300 subpart F or states a period of its own. That single distinction decides whether anything changes for you.
  • Ask whether the plan is being revised. An agency rewriting its plan before January 19 is doing so to preserve requirements it would otherwise lose. If a revision is in progress, the draft is worth asking to see — and if your bargaining unit is covered, the revision may be negotiable.
  • Check your specialized experience, not your calendar. Pull the OPM qualification standard for the series and grade you are targeting and read the specialized-experience paragraph. That is the requirement most likely to stop you, and it is the one the rule does not touch.
  • Read your position description for the ladder interval. Career-ladder progression intervals can survive as job-related agency requirements. If your PD specifies one, assume it still applies until HR tells you otherwise in writing.

One caution on timing. OPM's implementation guidance had not issued as of early November 2026, and the VEOA interaction is explicitly deferred to it. If your situation turns on how the removed restriction interacts with VEOA-based competition, that answer is not yet available from any authoritative source, and anyone offering you one is guessing.

Section VIII Questions

January 19, 2027. The DATES section of the final rule published at 91 FR 65887 reads: "This rule is effective January 19, 2027." The Federal Register metadata for the document carries the same date.

OPM's own press release announcing the rule says January 14, and a good deal of secondary coverage has copied that figure. Where a press release and the published rule disagree, the published rule controls. If your agency is working to January 14, point them at the DATES line in the Federal Register document itself.

Not automatically. Removing subpart F removes one bar among several. You still have to meet the OPM qualification standard for the target grade and series, which for most professional and administrative positions requires 52 weeks of specialized experience at the next lower level. You still have to be selected under your agency's merit promotion procedures. And your agency may impose its own service-in-grade period in its merit promotion plan.

In practice the qualification standard, not the old time-in-grade rule, is what stops most two-grade jumps.

Yes. OPM states in the final rule that agencies may establish their own service-in-grade periods provided the requirement is job-related, established in advance, set out in writing, and applied consistently. The natural home for that requirement is the agency merit promotion plan under 5 CFR 335.103.

Until an agency revises its plan, the existing plan continues to govern, minus the removed governmentwide restriction. So a plan that independently states a 52-week service requirement keeps operating on January 19 exactly as it did before.

Both were tied to the removed subpart F. On and after the effective date no OPM approval is required for an agency training agreement, previously granted approvals do not need to be renewed, converted or rescinded, and none of them lapse because of this rule.

The limit of two promotions within any 52-week period, which attached to service under a training agreement, no longer applies. Existing agency training agreements remain valid agency documents and continue to describe the agency's own developmental expectations.

No. Within-grade increases continue to run under 5 U.S.C. 5335 and 5 CFR part 531, subpart D, with the same waiting periods and the same acceptable level of competence determination. Quality step increases continue under 5 CFR part 531, subpart E.

Veterans' preference under 5 U.S.C. 2108 and VEOA eligibility under 5 U.S.C. 3304(f) are untouched, and OPM has said it will address the interaction with VEOA-based competition in implementation guidance.

The old rule did allow two-grade advancement in two-grade-interval lines at GS-6 through GS-11, so this was already possible in many career paths. What removing subpart F changes is that the one-grade ceiling no longer applies as a governmentwide matter anywhere.

The binding constraint becomes the qualification standard: you must have the specialized experience the target grade requires, which is normally measured at one grade below the target. Meeting a GS-14 standard from a GS-12 position is uncommon, and the rule does nothing to make it easier.